Taiwan factories · behind-the-meter storage · free

Own your power.

Turn your Taipower bill into a factory battery business case in seconds: the right size, the MOEA subsidy, payback, IRR and blackout backup hours.

🔒 Runs entirely in your browser. Nothing is uploaded, no sign-up.

Example: science-park factory, 3,000 kW contract

4 MWh / 2 MW battery
Payback
6 yrs
Project IRR
14.8 %
15-yr NPV
NT$16.4M
Backup @ 300 kW
12 h
Oct 2025 Taipower high-voltage TOU tariff and MOEA subsidy; ancillary-service revenue excluded.
NT$9.39
summer peak per kWh (16–22h)
NT$2.53
summer off-peak per kWh
NT$5M
MOEA subsidy per MWh (≤ 50 %)
≈ 0
dReg prices: excluded, so numbers stay conservative

Three steps to a battery decision

No consultant, no waiting for quotes. Know whether it pays before you talk to an integrator.

1

Enter your bill numbers

Contract capacity, summer peak kWh and non-summer semi-peak kWh. Tariff, cost and efficiency are all editable.

2

Get the right size

Compares every size from 0.5 to 10 MWh, keeps battery power within your contract capacity and peak load, and checks subsidy eligibility.

3

Print the report

Investment, subsidy, annual savings, payback, IRR, NPV, a 15-year cash-flow chart and backup hours, saved to PDF in one click.

Tariff hikes made factory batteries pay

The same 1 MW / 2 MWh system over 15 years at a 6 % discount rate (conservative demand-charge case):

Tariff Subsidy Payback IRR NPV (NT$ M)
2023 tariffNoNevernegative−21.2
2023 tariffYes10 yrs2.8 %−2.5
Current (Oct 2025)No10 yrs4.7 %−1.8
Current (Oct 2025)Yes6 yrs14.8 %+8.2
Storage TOU (proposed)Yes5 yrs20.6 %+15.6

Assumptions: NT$12.5 M/MWh build cost, 88 % round-trip efficiency, 2 %/yr fade, 6,000-cycle life, 1.5 %/yr O&M. Storage-TOU figures are reported design targets, not a published tariff.

Why now

Taiwan's grid is tight and AI demand is climbing. A factory's own power resilience is becoming a competitive edge.

4.62 M / 5.49 M

households hit by the 13 May 2021 and 3 March 2022 blackouts.

≈ 8.5 %

projected 2025 operating reserve margin: little room at the summer peak.

2.24 GW

expected AI data-center demand by 2028.

NT$564.5 B

10-year grid-resilience plan pushing a more distributed grid.

Roadmap

It starts with a free calculator. The long-term goal: battery networks that work like an energy bank, where stored power backs real value.

Live

Storage calculator

Bill in, size, subsidy, payback, IRR and backup out.

Next

15-minute load analysis

Import AMI meter data for exact sizing and contract-capacity tuning.

Planned

AI dispatch optimizer

Decides charge and discharge every day from tariffs, load and weather.

Research

Employee EV charging

Use the same storage to charge employee EVs off-peak.

FAQ

How accurate is it?

It is a first-pass estimate: dischargeable energy is inferred from monthly peak and semi-peak use. A final design needs 15-minute demand data, your contract-capacity structure and supplier quotes. The math is checked line-for-line against the Python model in the repo.

Why is ancillary-service revenue excluded?

Taipower's dReg / E-dReg market is saturated, and clearing prices were near NT$0 by late 2025. Leaving it out keeps the numbers conservative.

Is my data uploaded?

No. The calculator is one static page that runs in your browser. You can also download it and use it offline.

What are the subsidy conditions?

MOEA industrial storage subsidy: NT$5 M per MWh, up to 50 %, 1–10 MWh, factories in industrial / science / tech parks, domestic cells, non-PRC communication modules and a 3-year evening peak-shift commitment at 80 %. Check the latest MOEA notice.

Sources

Run the numbers first.

Two minutes to know whether a battery pays at your factory.

Open Peakwise →